Advanced · Operate an installation
How do you share load and preserve essential services?
Balance two gensets, handle a load step, then sustain the bus after losing G2.
Adjust speed and excitation separately. Advance time after an action to observe settling. Then try the load step or loss of G2.
G1 and G2: 500 kW / 625 kVA each. Balanced bus, 400 V line-to-line, 50 Hz; already synchronised.
Measurements
- Bus frequency
- —Hz
- Line-to-line voltage
- —V
- G1 · active power
- —kW
- G2 · active power
- —kW
- G1 · reactive power
- kvar
- Apparent
- kVA
- Line current
- A
- G2 · reactive power
- kvar
- Apparent
- kVA
- Line current
- A
A and B use the same reading time.
Advance to at least 12 s before checking steady operation.
Recorded evidence
- Choose an instrument to keep a reading.
Primer: power and reference settings
P in kW is active power; Q in kvar is reactive power exchanged with electric and magnetic fields. S = √(P² + Q²) in kVA and I = 1,000 S / (√3 U) in amperes, where U is line-to-line voltage. fref and Eref are no-load droop references, so they must exceed loaded bus values. At an equally shared 600 kW / 300 kvar load, fref = 51.2 Hz and Eref = 408 V give 50 Hz and 400 V here. Moving fref alone changes kW sharing; moving Eref alone changes kvar sharing. Both machines are already synchronised initially.
Installation, principle and limits
Aggregate model of a balanced lossless islanded bus; machines already synchronised. Governors: target Pm = 250 × (fref − f), bounded by 0 and engine limit; first-order response 0.6 s. Each machine has H = 4 s; df/dt = 50 × (ΣPm − Pload) / (2HΣSrated). Electrical outputs follow mechanical balance and common inertia. Excitation response: 0.5 s; Qi = 18.75 × (Ei − U), with ΣQi = Qload. No rotor-angle dynamics, detailed network, synchronisation, selectivity or automatic protection trips. Calculation stops outside 45–55 Hz or 340–460 V: model envelope, not a vessel protection setting. Losing G2 is irreversible within a trial; restart restores the initial state. This advanced study is not a complete chief-engineer programme and awaits practitioner review.
Woodward · easYgen-3000XT, droop and load-sharing principles ↗Advanced study · aggregate model awaiting practitioner review